Blazing a trail through innovation and leadership in sustainability

Aurora Medical Center – Manitowoc County in Wisconsin has been harnessing the power of renewable energy since 2017, when the facility installed solar panels on its lower roof.

Carilion Rockbridge Community Hospital
As part of a broader energy management plan, the hospital partnered with utility companies WPPI Energy and Two Rivers Water and Light to install a solar array. The array’s solar panels generate 70,000 kilowatt-hours, which offsets costs that can be redirected to patient care. The energy significantly reduces greenhouse gas emissions, tying into the hospital’s decarbonization goals. 

Read More

Related Resources

Case Studies
System achieves 10 ENERGY STAR® designations and validates over $100 million in utility savings since 2008.
Case Studies
Hospital employs an ESCO to build enthusiasm and achieve ENERGY STAR® 100.
Case Studies
Large system takes steps to recognize more than $13 million in energy savings over four years.
Case Studies
Hospital system in the District of Columbia saves $42,000 a year by bringing sustainability efforts into sharp focus.
Case Studies
New heating and water system in brand new facility tweaks design for improved sustainability.
Case Studies
Embracing energy efficiency to attain measurable results is a facility-wide effort.