Managing Hospital Electrical Shutdowns

 

publication cover
by David Stymiest, PE, CHFM, FASHE, and Jason D'Antona, PE, LEED AP

Electrical equipment requires regular repair or maintenance, yet this critical work is often deferred in hospitals because it is difficult to gain approval to turn off the power. With NFPA 70E-2012: Standard for Electrical Safety in the Workplace becoming more stringent and the increasing recognition that electrical system maintenance is an emergency management issue, hospitals are facing the inevitability of more electrical power shutdowns. This ASHE Monograph examines a comprehensive approach to managing power shutdowns in light of the growing complexity of hospital infrastructure and operational constraints. All hospitals will need to turn off their electrical power systems for modification and maintenance at some point. The comprehensive and proactive utility management program (UMP) approach described in this monograph allows a hospital to use lessons learned from actual shutdowns to improve its electrical infrastructure, power system reliability, and staff training regarding what to do when power is lost.

 

 

 Access PDF Members can download a PDF of the entire monograph
Order print version Catalog number: 055978
Member: $25.00, Nonmember: $35.00

 

Related Resources

Lunch and Learn
Walk through the electrical safety roadmap from pre-design through installation and post-installation.
Lunch and Learn
This course will walk participants through site acceptance and in-service testing and will review best practices that will empower facility owners…
On-Demand Educational Webinars
in this session we will explore the unintended consequences of having so many sinks. We will explore the dynamics of transmission from patient to…
Lunch and Learn
In this webinar, the presenters will review current and proposed CMS/TJC requirements in the context of ASHRAE 188 and will discuss practical…
Lunch and Learn
This presentation will provide an overview of annual fire door inspection requirements, strategies for remediation of non-compliant issues and on-…
Lunch and Learn
We examine the effectiveness of capture efficiencies at different MERV ratings. And we explore why MERV-A ratings are critical for determining filter…