Construction to Maintenance Work Flow Tool

construction to maintenance work flow tool

An effective preventive maintenance work flow should begin from the beginning of a construction project. ASHE’s “Construction to Maintenance Work Flow Tool” provides a diagram to help ensure that preventive maintenance operations are ingrained into the building of new facilities.

Members Download ToolAvailable to ASHE Members. Click here to join ASHE!
Learn moreRead the related HFM Magazine article! Learn more about how to use the tool effectively.

Related Resources

Case Studies
System achieves 10 ENERGY STAR® designations and validates over $100 million in utility savings since 2008.
Case Studies
Hospital employs an ESCO to build enthusiasm and achieve ENERGY STAR® 100.
Case Studies
Large system takes steps to recognize more than $13 million in energy savings over four years.
Case Studies
Hospital system in the District of Columbia saves $42,000 a year by bringing sustainability efforts into sharp focus.
Case Studies
New heating and water system in brand new facility tweaks design for improved sustainability.
Case Studies
Embracing energy efficiency to attain measurable results is a facility-wide effort.