Success Stories - Midland Memorial Hospital

Overview of Case Study

Sometimes even newer hospitals can be tweaked to improve sustainability. That was the case with Midland Memorial Hospital in Midland, Texas, which opened a new patient tower in December 2012.

“When we became involved with Midland Memorial in 2014, we did a study that assessed the systems and the lay of the land and realized there were a lot of moving parts because of the recent expansion,” explains James Hess, Energy Engineer at Bernhard TME, the engineering firm that helped the hospital reduce energy consumption. “The hospital had 445,000 square feet prior to 2012, but with the new patient tower that rose to 789,000 square feet. The building had been commissioned when it was opened, but we still found significant savings potential.”

Bernhard TME developed a wide range of energy-saving plans for the hospital, ranging from tweaking the Johnson Controls Metasys building automation system (BAS) to a complete upgrade of the heating water system and chilled water system.

Read More

Related Resources

On-Demand Educational Webinars
Lunch and Learn
George Mills, CEO of ATG (a JLL company), and former Director of Engineering with The Joint Commission, will focus on Life Safety in business…
On-Demand Educational Webinars
Just Ask ASHE:Q1 2021 WebinarSpeaker: ASHE
Lunch and Learn
This webinar discuss how to break the reactive and expensive cycle that plaques most facilities and turn the corner towards positive audits and long…
Lunch and Learn
During this webinar, we will explore the barriers healthcare networks face at each stage and discuss the strategies to overcome them so you can…
Lunch and Learn
This webinar covers these two types of systems and the code requirements that apply to each. Learn when and where to use them, and the varying…