Success Stories - Midland Memorial Hospital

Overview of Case Study

Sometimes even newer hospitals can be tweaked to improve sustainability. That was the case with Midland Memorial Hospital in Midland, Texas, which opened a new patient tower in December 2012.

“When we became involved with Midland Memorial in 2014, we did a study that assessed the systems and the lay of the land and realized there were a lot of moving parts because of the recent expansion,” explains James Hess, Energy Engineer at Bernhard TME, the engineering firm that helped the hospital reduce energy consumption. “The hospital had 445,000 square feet prior to 2012, but with the new patient tower that rose to 789,000 square feet. The building had been commissioned when it was opened, but we still found significant savings potential.”

Bernhard TME developed a wide range of energy-saving plans for the hospital, ranging from tweaking the Johnson Controls Metasys building automation system (BAS) to a complete upgrade of the heating water system and chilled water system.

Read More

Related Resources

On-Demand Educational Webinars
This presentation provides an outline for the first step in the resiliency process: assessing your facility’s vulnerability.
On-Demand Educational Webinars
Jonathan Flannery, Spencer Moore, Mark Mochel. ASHE’s Healthcare Executive Leadership Council conducted an assessment of best practices associated…
On-Demand Educational Webinars
Timothy Adams, Benjamin Leutze, Joanna Lynch. Medical telemetry is used in most hospitals and many outpatient facilities. This session explores the…
On-Demand Educational Webinars
A team approach to survey the kitchen on a routine basis, and know what to look for and ask kitchen staff, is key to preventing a kitchen disaster.
Lunch and Learn
The Joint Commission is now stressing the need to maximize technology during surveys to minimize contact. Many hospitals around the country still…