Success Stories - Midland Memorial Hospital

Overview of Case Study

Sometimes even newer hospitals can be tweaked to improve sustainability. That was the case with Midland Memorial Hospital in Midland, Texas, which opened a new patient tower in December 2012.

“When we became involved with Midland Memorial in 2014, we did a study that assessed the systems and the lay of the land and realized there were a lot of moving parts because of the recent expansion,” explains James Hess, Energy Engineer at Bernhard TME, the engineering firm that helped the hospital reduce energy consumption. “The hospital had 445,000 square feet prior to 2012, but with the new patient tower that rose to 789,000 square feet. The building had been commissioned when it was opened, but we still found significant savings potential.”

Bernhard TME developed a wide range of energy-saving plans for the hospital, ranging from tweaking the Johnson Controls Metasys building automation system (BAS) to a complete upgrade of the heating water system and chilled water system.

Read More

Related Resources

Education & Events
Safeguard against fire-related hazards with NFPA 101 Life Safety Code. Protect patients, staff, and visitors in health care facilities.
Monograph
Cut your health care facility's operational costs with our tips, tactics, and case studies for energy cost reduction.
Monograph
This monograph provides a detailed comparison between the 2000, 2012, 2015, and 2018 editions of NFPA 101: Life Safety Code® and the 2015 and 2018…
Monograph
This monograph provides a step-by-step model for building a business case in support of energy resiliency investments in health care facilities. It…