Success Stories - University of Maryland Medical Center

Overview of Case Study

UMMC is the academic medical center of the 13-hospital University of Maryland Medical System. The initial UMMC structure was built in 1937, and six additions from 1957 to 2013 have brought the facility’s floorspace to 2.5 million square feet.

Richie Stever, CHFM, CLSS-HC, UMMC’s director of operations and maintenance, did not have specific outcomes in mind for the treasure hunt. He saw the treasure hunt as a way to help UMMC reach its goal of reducing energy consumption by 20 percent by 2022 as part of the Better Buildings Challenge through the U.S. Department of Energy (DOE).

Read More

Related Resources

Compliance Tools
Learn how to locate potential hazards during a fire watch with our comprehensive checklist and guidelines. Ensure the safety of your premises.
Compliance Tools
Classification schemas are designed to provide health care planners, designers, and operators with a common nomenclature, and to generate these…
On-Demand Educational Webinars
Kevin Scarlett, Jacob McCall, Benjamin Leutze. This presentation will address the reasons behind these standards, common compliance questions and the…
Lunch and Learn
Understand domestic water distribution and treatment, as well as the various potable water treatment methods, how to apply those methods…