Success Stories - University of Maryland Medical Center

Overview of Case Study

UMMC is the academic medical center of the 13-hospital University of Maryland Medical System. The initial UMMC structure was built in 1937, and six additions from 1957 to 2013 have brought the facility’s floorspace to 2.5 million square feet.

Richie Stever, CHFM, CLSS-HC, UMMC’s director of operations and maintenance, did not have specific outcomes in mind for the treasure hunt. He saw the treasure hunt as a way to help UMMC reach its goal of reducing energy consumption by 20 percent by 2022 as part of the Better Buildings Challenge through the U.S. Department of Energy (DOE).

Read More

Related Resources

On-Demand Educational Webinars
Through this webinar, Tyler Greenwood and Dennis Ford provide a roadmap for developing a program for continual certification and share lessons…
On-Demand Educational Webinars
Understand how the structural design loads for parking structures differ from those of occupied spaces, and more.
On-Demand Educational Webinars
With the constantly evolving criteria required to address the surge of patients impacted by the COVID-19 virus, there are many options that health…