Operating Room HVAC Setback Strategies

 

Risk Assessment of Medical Equipment (cover)
by Christy Love, LEED AP, BD+C, et al.

Operating room setback is a proven energy-saving strategy for hospitals and ambulatory surgery centers in all climates. However, because of the unique constraints governing the design and operation of ORs, several factors must be considered when designing a solution for a particular facility. A successful solution must take into account the local climate, facility type, and user needs and adhere to applicable code requirements.

Each of the many potential setback solutions has corresponding trade-offs between the level of control, complexity, and cost of the strategy chosen. This paper outlines the possibilities to consider and provides questions to ask in determining which approach to use for a particular situation. An experienced design professional with detailed knowledge of the facility and its users’ needs can assist facility staff in identifying the optimal solution.

 

 Access PDF Members can download a PDF of the entire monograph
Order print version Catalog number: 055577
Member: $25.00, Nonmember: $35.00

 

 

Related Resources

Case Studies
Treasure Hunt uncovers $116,600/year in potential energy savings to reallocate to patient care.
Case Studies
Using renewable energy sources, hospital reduces annual utility bill from more than $3 million to $2.8 million despite an almost 40% increase in the…
Case Studies
Team approach and the strategic use of data helps downtown hospital earn ENERGY STAR® certification.
Case Studies
System achieves 10 ENERGY STAR® designations and validates over $100 million in utility savings since 2008.
Case Studies
Hospital employs an ESCO to build enthusiasm and achieve ENERGY STAR® 100.
Case Studies
Large system takes steps to recognize more than $13 million in energy savings over four years.