Success Stories - University of Maryland Medical Center

Overview of Case Study

UMMC is the academic medical center of the 13-hospital University of Maryland Medical System. The initial UMMC structure was built in 1937, and six additions from 1957 to 2013 have brought the facility’s floorspace to 2.5 million square feet.

Richie Stever, CHFM, CLSS-HC, UMMC’s director of operations and maintenance, did not have specific outcomes in mind for the treasure hunt. He saw the treasure hunt as a way to help UMMC reach its goal of reducing energy consumption by 20 percent by 2022 as part of the Better Buildings Challenge through the U.S. Department of Energy (DOE).

Read More

Related Resources

Resources
The health care infrastructure is also a key candidate for digital transformation.
Standards/Guidelines
ANSI/ASHRAE/ASHE Standard 170 offers guidance, regulation and mandates to designers and operators of health care facilities. The revised 2021 edition…
Lunch and Learn
This seminar explores the drivers behind these changes and prepares the attendee to navigate the quickly evolving landscape through practical…
Standards/Guidelines
The purpose of this standard is to prescribe the procedures, methods, and documentation requirements for the design, construction, and operation of…
Compliance Tools
Use this worksheet to periodically check for reactive maintenance concerns that could be wasting time and energy. Focusing first on squeaky wheels…