Success Stories - University of Maryland Medical Center

Overview of Case Study

UMMC is the academic medical center of the 13-hospital University of Maryland Medical System. The initial UMMC structure was built in 1937, and six additions from 1957 to 2013 have brought the facility’s floorspace to 2.5 million square feet.

Richie Stever, CHFM, CLSS-HC, UMMC’s director of operations and maintenance, did not have specific outcomes in mind for the treasure hunt. He saw the treasure hunt as a way to help UMMC reach its goal of reducing energy consumption by 20 percent by 2022 as part of the Better Buildings Challenge through the U.S. Department of Energy (DOE).

Read More

Related Resources

Guides/Reports
This report from HKS and Arup, with peer review and collaboration from ASHE walks through design strategies that can help facilities stay operational…
Lunch and Learn
Learn about plant optimization and the variety of approaches used for minimizing costs. Understand the steps towards an optimized plant. Hear a few…
Monograph
Support your efforts to strengthen your energy procurement and resiliency policies and finance your sustainability projects.
Guides/Reports
A step-by-step guide for developing a comprehensive integrated fire protection and life safety inspection, testing and maintenance (ITM) program for…
Monograph
Best practices for financing energy sustainability are described with an emphasis on helping hospitals and associated decision-makers – including…