Success Stories - University of Maryland Medical Center
Overview of Case Study
UMMC is the academic medical center of the 13-hospital University of Maryland Medical System. The initial UMMC structure was built in 1937, and six additions from 1957 to 2013 have brought the facility’s floorspace to 2.5 million square feet.
Richie Stever, CHFM, CLSS-HC, UMMC’s director of operations and maintenance, did not have specific outcomes in mind for the treasure hunt. He saw the treasure hunt as a way to help UMMC reach its goal of reducing energy consumption by 20 percent by 2022 as part of the Better Buildings Challenge through the U.S. Department of Energy (DOE).
Related Resources
Guides/Reports
This collection of articles will help health care facilities professionals understand and prepare for new trends that experts anticipate emerging i
Compliance Tools
Taming building automation system alarm fatigue
Education & Events
Increase your understanding of electrical systems, the lifeblood of the health care facility.
Compliance Tools
Determine which requirements can be completed in-house and the possible cost benefits of each.
Education & Events
Understand the Storage and use of Medical Gas Cylinder with the 2012 Edition of NFPA 99 in Mind