Success Stories - University of Maryland Medical Center

Overview of Case Study

UMMC is the academic medical center of the 13-hospital University of Maryland Medical System. The initial UMMC structure was built in 1937, and six additions from 1957 to 2013 have brought the facility’s floorspace to 2.5 million square feet.

Richie Stever, CHFM, CLSS-HC, UMMC’s director of operations and maintenance, did not have specific outcomes in mind for the treasure hunt. He saw the treasure hunt as a way to help UMMC reach its goal of reducing energy consumption by 20 percent by 2022 as part of the Better Buildings Challenge through the U.S. Department of Energy (DOE).

Read More

Related Resources

Resources
This 2 day event brings together health care facilities professionals on a quest to discover low-cost energy savings opportunities at a hospital or…
Resources
Since 2010, over 3,500 facilities have recognized significant energy savings through the Energy to Care program.
Guides/Reports
First significant benchmarking effort in health care facility management operations based on information collected by IFMA and ASHE
Guides/Reports
Expanded analysis of Health Facilities Management 2012 compensation survey by primary area of responsibility, organizational setting, number of beds…
Advocacy
The 2017 ASHE Advocacy Report includes articles on improving codes, code compliance, and outreach.
Compliance Tools
This downloadable Word document is a sample monthly log for maintaining special ventilation rooms.