Success Stories - University of Maryland Medical Center

Overview of Case Study

UMMC is the academic medical center of the 13-hospital University of Maryland Medical System. The initial UMMC structure was built in 1937, and six additions from 1957 to 2013 have brought the facility’s floorspace to 2.5 million square feet.

Richie Stever, CHFM, CLSS-HC, UMMC’s director of operations and maintenance, did not have specific outcomes in mind for the treasure hunt. He saw the treasure hunt as a way to help UMMC reach its goal of reducing energy consumption by 20 percent by 2022 as part of the Better Buildings Challenge through the U.S. Department of Energy (DOE).

Read More

Related Resources

On-Demand Educational Webinars
Recorded May 17, 2016 Speakers: Robert Reardon and Leslie Hanson
On-Demand Educational Webinars
Recorded May 18, 2016 Speakers: William E. Koffel, P.E., FSFPE and Mark J.
On-Demand Educational Webinars
As deadlines approach for complying with OSHA's GHS-aligned Hazard Communication Standard (HazCom 2012), environmental health and safety (EH…
On-Demand Educational Webinars
All three parts of this webinar series are available for members by clicking below.
A building’s HVAC system is designed to perform several tasks: filter, cool, heat, humidify, dehumidify, pressurize, and/or exhaust.