Success Stories - University of Maryland Medical Center

Overview of Case Study

UMMC is the academic medical center of the 13-hospital University of Maryland Medical System. The initial UMMC structure was built in 1937, and six additions from 1957 to 2013 have brought the facility’s floorspace to 2.5 million square feet.

Richie Stever, CHFM, CLSS-HC, UMMC’s director of operations and maintenance, did not have specific outcomes in mind for the treasure hunt. He saw the treasure hunt as a way to help UMMC reach its goal of reducing energy consumption by 20 percent by 2022 as part of the Better Buildings Challenge through the U.S. Department of Energy (DOE).

Read More

Related Resources

Guides/Reports
This 2013 ASHE Advocacy Report features articles on the unique hospital environment, improving codes and standards, and ways to get involved.
Monograph
The study compares anticipated plug load with energy intensity data provide guidance for designers in estimating a facility's design load.
Videos
Speakers: Robert Gesing & John Chory
Videos
Speakers: Christy Love, John Inman, Linda Dickey & Mike Hatton2013 PDC Summit
On-Demand Educational Webinars
Recorded December 4, 2013Speaker: Mike Daniel, President of Daniel Consulting, Lt