Success Stories - University of Maryland Medical Center

Overview of Case Study

UMMC is the academic medical center of the 13-hospital University of Maryland Medical System. The initial UMMC structure was built in 1937, and six additions from 1957 to 2013 have brought the facility’s floorspace to 2.5 million square feet.

Richie Stever, CHFM, CLSS-HC, UMMC’s director of operations and maintenance, did not have specific outcomes in mind for the treasure hunt. He saw the treasure hunt as a way to help UMMC reach its goal of reducing energy consumption by 20 percent by 2022 as part of the Better Buildings Challenge through the U.S. Department of Energy (DOE).

Read More

Related Resources

On-Demand Educational Webinars
Recorded October 26, 2015This webinar features George Mills, MBA, FASHE, CEM, CHFM, director of the Department of Enginee
On-Demand Educational Webinars
Recorded September 15, 2015This webinar discusses the latest information about an important Federal Communications Commis
Compliance Tools
This downloadable Word document is a sample pressure relationship policy you can customize to fit the needs of your facility.
Guides/Reports
The 2014 ASHE Advocacy Report includes articles on improving codes, code compliance, and outreach.