Success Stories - University of Maryland Medical Center

Overview of Case Study

UMMC is the academic medical center of the 13-hospital University of Maryland Medical System. The initial UMMC structure was built in 1937, and six additions from 1957 to 2013 have brought the facility’s floorspace to 2.5 million square feet.

Richie Stever, CHFM, CLSS-HC, UMMC’s director of operations and maintenance, did not have specific outcomes in mind for the treasure hunt. He saw the treasure hunt as a way to help UMMC reach its goal of reducing energy consumption by 20 percent by 2022 as part of the Better Buildings Challenge through the U.S. Department of Energy (DOE).

Read More

Related Resources

Videos
Speakers: Gerry Kaiser and Lindsey Brackett 
Compliance Tools
The emergency power supply system (EPSS) is a critical hospital system, and its failure to function in a power outage can have tragic res
Compliance Tools
A sprinkler system can be complex with many different zones and valves. Some of those valves may be easily to locate.
Compliance Tools
This document provides a checklist for hospitals to document the inspection, testing, and maintenance of fire safety equipment and fire safety buil
Monograph
This monograph describes an EPS management program that will equip health care facilities to meet the requirements and challenges they face today.
On-Demand Educational Webinars
Speakers: Bob Bedard, Gordon Burrill, Eileen Clarkson